|
ICF WALL Homes and Buildings
The ICF walls are installed up to the first floor level. The steel frame floor system is put in place with the appropriate connectors. The floor is then sheathed.
Then the first level walls are poured. Once the concrete is cured, the next level ICF walls are erected.
The roof system is assembled and bolted to the top of the ICF wall.
|